DRAFT Air Quality Conformity Determination Between The 2040 Regional Transportation Plan, The Fiscal Year 2012 to 2015 Transportation Improvement Program and The Indiana State Implementation Plan for Air Quality December 8, 2011 Northwestern Indiana Regional Planning Commission Portage, Indiana www.nirpc.org Northwestern Indiana Regional Planning Commission _______ ____Air Quality Conformity Determination Table of Contents Purpose 1 Applicability 1 Priority 2 Consultation 2 Public Consultation 3 Content of the Transportation Plan 3 Table 1. Connections 2030 Regional Transportation Plan Projects 4 Relationship of the Transportation Plan and TIP Conformity to the NEPA Process 7 Fiscal Constraints for the Transportation Plan and Transportation Improvement Program 7 Criteria and Procedures for the Conformity Determination 7 Latest Planning Assumptions 7 Table 2. Socioeconomic Totals 8 Table 3. Vehicle-Miles of Travel 9 Table 4. Model Calibration Summary 9 Latest Emissions Model 11 TCM Implementation 11 Consistency with Motor Vehicle Emissions Budgets in the State Implementation Plan 11 Emission Reductions in Areas Without Motor Vehicle Emissions Budgets 12 Procedures for Determining Regional Transportation-related Emissions 12 Table 5. Regional Emissions Analysis Results 13 Conclusion 15 Appendices (available online at www.nirpc.org) A Resolution 11-?? Making the Air Quality Conformity Determination B Socioeconomic Forecasts (Detail) C Exempt Project Types D FY 2012 to 2015 Transportation Improvement Program Project Listing E Mobile 6.2 Input Files F Toll Parameters Northwestern Indiana Regional Planning Commission _______ ____Air Quality Conformity Determination Purpose The purpose of this report is to document compliance with section 176(c) of the Clean Air Act as amended (CAAA), and the related requirements of the Final Transportation Conformity Rule (40 CFR Part 51 and 40 CFR Part 93). The air quality conformity determination establishes the compatibility between the state implementation plan, the regional transportation plan and transportation improvement program. The transportation plan includes the region’s guide for transportation system development over a twenty-year period. The transportation improvement program (TIP) includes the region’s choices for Federal spending on expansion and preservation of the transportation system over a four to five year period. The State Implementation Plan (SIP) includes strategies for attainment and maintenance of the National Ambient Air Quality Standards (NAAQS). The conformity determination is based on a regional emissions analysis that demonstrates compatibility among these three planning documents. The regional emissions analysis uses the region’s transportation network model and the USEPA’s MOBILE 6.2 emissions model to quantify the emissions from all vehicles on the future transportation system. For Lake and Porter Counties, annual emissions of fine particles and nitrogen oxides must not exceed their levels of 2002 and Summer day emissions of Volatile Organic Compounds and Nitrogen Oxides must not exceed Motor Vehicle Emission Budgets established in the State Implementation Plan. For LaPorte County, Summer day emissions of Volatile Organic Compounds and Nitrogen Oxides must not exceed the Motor Vehicle Emission Budgets in the State Implementation Plan. The system that was analyzed includes all regionally significant capacity expansion projects in the Lake, Porter and Laporte County area, and significant projects in northeastern Illinois, regardless of the funding sources. Applicability Action Applicability This conformity determination is required for: adoption, acceptance, approval or support of the Regional Transportation Plan and the Transportation Improvement Program developed pursuant to 23 CFR Part 450 and 49 CFR Part 613. Geographic Applicability This conformity determination is required in the ozone non-attainment areas, including the Lake/Porter County maintenance area and the La Porte County maintenance area, with respect to the Summer day mobile-source emissions of VOCs and NOx. Lake and Porter Counties are designated as maintenance of the National Ambient Air Quality Standard (NAAQS) for “8-hour” ozone. La Porte County is also designated as maintenance of the National Ambient Air Quality Standard for “8-hour” ozone. All three counties are currently meeting the standards. This conformity determination is required in the PM2.5 non-attainment area, including the entire Chicago consolidated metropolitan statistical area, with respect to annual mobile source emissions of NOX and direct PM2.5. Lake and Porter Counties in Northwestern Indiana, as part of the Chicago consolidated metropolitan statistical area, are classified as non-attainment of the annual National Ambient Air Quality Standard (NAAQS) for PM2.5. A request has been made by the State of Indiana to reclassify Lake and Porter Counties as maintenance of the PM2.5 standard. The request includes a maintenance plan with draft motor vehicle emissions budgets. This conformity determination is based on the requirement of Section 93.118 of the Conformity Rule for the regional emissions analysis to indicate compliance with the emissions budgets established in the State Implementation Plan for VOC and NOx emissions in Lake and Porter Counties and in LaPorte County. The regional transportation plan and transportation improvement program must not result in Summer day emissions of VOC and NOx in 2016, 2020, 2030 and 2040 in excess of the applicable budgets. 1 Northwestern Indiana Regional Planning Commission _______ ____Air Quality Conformity Determination This conformity determination is based on the requirement of Section 93.119 of the Conformity Rule for the regional emissions analysis to indicate interim reductions of the annual emissions of Nitrogen Oxides and direct PM2.5 in the overall PM2.5 nonattainment area, including Lake and Porter Counties and six counties in northeastern Illinois. The Indiana and Illinois State Implementation Plans for Air Quality have not established annual emissions budgets for highway mobile sources of direct PM2.5 and NOX. The regional transportation plan and transportation improvement program must not result in annual emissions of direct PM2.5 and NOX from mobile sources in 2016, 2020, 2030 and 2040 in excess of the 2002 emissions. Priority Transportation Control Measures (TCM) in the State Implementation Plan must be given funding priority in the FHWA/FTA approval of any action with air quality consequences. The State Implementation Plan for Lake and Porter Counties and for LaPorte County includes no transportation control measures. This conformity determination is not required to demonstrate priority for TCMs. Consultation This conformity determination has been conducted with the involvement of the United States Department of Transportation (USDOT) through the Federal Highway Administration Indiana Division (FHWA) and Federal Transit Administration Region 5 (FTA), United States Environmental Protection Agency Region 5 (USEPA), Indiana Department of Transportation (INDOT), Illinois Department of Transportation (IDOT), Indiana Department of Environmental Management (IDEM), Chicago Metropolitan Agency for Planning (CMAP) and Northwestern Indiana Regional Planning Commission (NIRPC). The consultation process included the issues and procedures that are listed in section 93.105 of the final conformity rule and the August 2007 Interagency Consultation Guidance. A consultation meeting was conducted on August 3, 2011. The meeting was attended by representatives of the Northwestern Indiana Regional Planning Commission, Indiana Department of Environmental Management, Indiana Department of Transportation and United States Environmental Protection Agency. The proposed action is a conformity analysis to support an amendment to the 2040 Comprehensive Regional Plan and the FY 2012-2015 Transportation Improvement Program. The revision involves two projects. The City of Hammond is initiating work on the reconstruction and added travel lanes on the former SR-312. The reconstruction is on the segments of Chicago Street from Calumet Avenue (US-41) to White Oak Avenue. The added travel lanes are on Gostlin Street from the Illinois State Line to Sheffield Avenue, Sheffield Avenue from Gostlin Street to Chicago Street and Chicago Street from Sheffield Avenue to Calumet Avenue (US-41). All of the added travel lane segments would be constructed between 2016 and 2020. The Schererville project is currently in the 2040 plan in the 2030 to 2040 time frame. The Town of Schererville has identified four phases. The first phase, from US-30 to Junction Street would be complete by December 2014. The second phase, from Junction Avenue to Division Street would be constructed between 2016 and 2020. The third phase, from Division Street to Oak Street would be constructed between 2016 and 2020 and the fourth phase, from Oak Street to Main Street would be constructed between 2016 and 2020. If there is a need to move one or more of these phases to another time frame, another conformity analysis could be completed in the future. Schererville will further define the segmentation and costs in the near future. The discussion about the conformity analysis included the need to use the latest planning assumptions. The parameters of the analysis will be the same as the recent analysis for the 2040 plan and 2012 to 2015 TIP. INDOT’s consultants are not ready to release the new vehicle fleet mix data yet, so the older vehicle fleet mix information is still in effect. The analysis is anticipated to start prior to the release of the newer data. The 2 Northwestern Indiana Regional Planning Commission _______ ____Air Quality Conformity Determination IDEM, INDOT and USEPA representatives agreed that the analysis can start immediately using the existing fleet information and all other latest planning assumptions that were used in the recent conformity analysis. The time frame for the amendments includes an analysis to be completed in early August, with the start of the public comment period to begin as soon as the analysis and documentation are complete. Action on the conformity determination and the amendments of the plan and program are anticipated in September. Pending the concurrence of the Federal Highway Administration, the analysis will begin prior to August 8. The next meeting will be scheduled when the documents are ready for review by the consultation agencies. Public consultation In compliance with the adopted NIRPC Public Involvement Procedure, an opportunity for public comment on the proposed conformity determination has been provided. A media release was issued on October 31, 2011 that established a comment period extending from the November 1, 2011 to December 2, 2011. This proposed conformity determination was made available to the public for review at the NIRPC offices, 6100 Southport Road, Portage and on the web at www.nirpc.org. Content of the Transportation Plan The transportation plan specifically describes the transportation system envisioned for the following horizon years: 2016, 2020, 2030 and 2040. These horizon years meet the requirements of Section 93.106 (a)(1) of the conformity rule. The transportation plan quantifies and documents the demographic and employment factors influencing expected transportation demand. The future levels of population, households and employment imply the magnitude of development envisioned for each traffic analysis zone. These forecasts are based on the 2040 Growth and Revitalization Vision adopted by NIRPC on October 28, 2010. The highway and transit systems are described in terms of the regionally significant additions or modifications to the existing transportation network, which the transportation plan envisions to be operational in the analysis years. The capacity-expansion projects in the 2040 Regional Transportation Plan are listed on Table 1. Additions and modifications to the highway network are sufficiently identified to indicate intersections with existing regionally significant facilities, and to determine their effect on route options between transportation analysis zones. Each added or modified highway segment is sufficiently identified in terms of its design concept and design scope to allow modeling of travel times under various traffic volumes, consistent with the modeling methods for area-wide transportation analysis in use by NIRPC. The NIRPC transportation model includes network links representing road segments for all collector and higher functional classifications, with nodes representing all significant intersections. Transit facilities, equipment, and services envisioned for the future are identified in terms of design concept. The design scope and operating policies for these transit projects have been assumed for the regional emissions analysis, based on local transit services. The NIRPC transportation model includes a mode choice model, and the transportation model is used to estimate transit ridership from the implementation of future transit facilities, equipment and services. Table 1 lists the projects, beginning with projects proposed for completion since 2010. This table includes the Cline Avenue (SR-912) project with two options currently under consideration. INDOT is reviewing two solutions for Cline Ave: the ground route alternative utilizing Riley and Dickey roads, and a four- lane bridge alternative. The analysis includes both options. 3 Northwestern Indiana Regional Planning Commission _______ ____Air Quality Conformity Determination Table 1. 2040 Comprehensive Regional Plan Capacity Expansion Projects in the Regional Emissions Analysis 2016 Network ID 38a Agency Road From To Cedar Lake 133rd Avenue US-41 Industrial Drive Completion before Concept Scope Model Representation 2016 Principal Arterial Street Added Center Turn Lane Increase capacity by 10% ID 38a Agency Road From To Gary Buffington Access 2A-3 SR-912 Casinos Completion before ConceptScope Model Representation 2016 Collector Street Added Travel Lanes Add 1 lane in each direction ID 226 Agency Road From To Hobart 61st Avenue Colorado Street SR-51 Completion before Concept Scope Model Representation 2016 Minor Arterial Street Added Center Turn Lane Increase capacity by 10% ID 232 Agency Road From To IDOT I-80 US-30 US-45 Completion before ConceptScope Model Representation 2016 Interstate Highway Added travel Lanes Add 1 lane in each direction ID 121 Agency Road From To INDOT SR-2 one half mile West of I-65 one half mile East of I-65 Completion before Concept Scope Model Representation 2016 Principal Arterial Highway Added Travel Lanes Add 1 travel lane in each direction ID 29 Agency Road From To INDOT SR-49 one half mile N. of CR-400N one half mile S. of CR-400N Completion before Concept Scope Model Representation 2016 Principal Arterial Highway Interchange New Interchange to Replace At-grade Intersection New links, 1 travel lane in each direction, ramp attributes ID 85 Agency Road From To INDOT US-421 N. Jct SR-2 S. Jct. SR—2 Completion before Concept Scope Model Representation 2016 Principal Arterial Highway Added Travel Lanes Add 1 travel lane in each direction ID 233 Agency Road From To INDOT US-20 Woodland Avenue Johnson Road Completion before Concept Scope Model Representation 2016 Principal Arterial Street Added Center Turn Lane Increase capacity by 10% ID 234 Agency Road From To INDOT SR-912 Dickey Road Riley Road Completion before ConceptScope Model Representation 2016 Expressway Two Options described above Table 1 4 Northwestern Indiana Regional Planning Commission _______ ____Air Quality Conformity Determination Table 1 Continued (2016 Network) ID Agency Lake County Completion before 2016 235 Road 45th Avenue Concept Minor Arterial Street From Colfax Street Scope Added Center Turn Lane To Cleveland Street Model Representation Increase capacity by 10% ID Agency Merrillville Completion before 2016 105 Road MississippiStreet Concept Minor Arterial Street From US-30 Scope Added Travel Lanes To 101st Avenue Model Representation Add 1 travel lane in each direction ID Agency Munster Completion before 2016 86 Road Main Street Concept Minor Arterial Street From Burnham Avenue Scope New Construction New links, 2 travel lanes in each direction, Minor Arterial To Columbia Avenue Model Representation attributes ID Agency Munster Completion before 2016 217 Road 45th Avenue Concept Minor Arterial Street From At Calumet Avenue Scope Intersection Realignment To Model Representation Reconfigure intersection links ID Agency Valparaiso Completion before 2016 214 Road Vale Park Road East Concept Minor Arterial Street From Calumet Avenue Scope Added Travel Lanes To Silhavy Road Model Representation Add 1 travel lane in each direction ID Agency Schererville Completion before 2020 96a Road Kennedy Avenue Concept Minor Arterial Street From Junction Street Scope Added Travel Lanes To US-30 Model Representation Add 1 travel lane in each direction 2020 Network ID 38b Agency Road From To Gary Buffington Access 3 SR-912 Casinos Completion before ConceptScope Model Representation 2020 Collector Road Added Travel Lanes Add one travel lane in each direction ID 236 Agency Road From To IDOT I-57 At I-294 Completion before ConceptScope Model Representation 2020 Interstate New Interchange New links, ramp attributes ID Agency Merrillville Completion before 2020 214 Road 101st Avenue Concept Minor Arterial Highway From SR-53 Scope Added Travel Lanes To Mississippi Street Model Representation Add one travel lane in each direction Table 1 Continued (2020 Network) 5 Northwestern Indiana Regional Planning Commission _______ ____Air Quality Conformity Determination ID Agency Michigan City Completion before 2020 88 Road Springland Avenue Concept Collector Road From Karwick Road Scope New Construction New links, 1 travel lane in each direction, Collector To Royal Road Model Representation attributes ID Agency St. John Completion before 2020 218 Road 93rd Avenue Concept Minor Arterial Street From White Oak Avenue Scope Added Center Turn Lane To US-41 Model Representation Increase capacity by 10% ID Agency Schererville Completion before 2020 96b Road Kennedy Avenue Concept Minor Arterial Street From Main Street Scope Added Travel Lanes To Junction Street Model Representation Add 1 travel lane in each direction ID Agency Hammond Completion before 2020 240 Road Gostlin/Sheffield/Chicago Concept Minor Arterial Street From Illinois State Line Scope Added Travel Lanes To US-41 Model Representation Add one travel lane in each direction 2030 Network ID Agency Porter County Completion before 2030 237 Road Willowcreek Road Concept Minor Arterial Highway From CR-700N Scope New Construction New links, 2 travel lanes in each direction, Minor Arterial To US-30 Model Representation attributes 2040 Network ID 238 Agency Road From To La Porte Economic Development Corridor Northeast SR-39 SR-2 Completion before ConceptScope Model Representation 2040 Collector Street New Construction New Links, 1 travel lane in each direction, collector attributes ID 115 Agency Road From To La Porte Boyd Boulevard US-35 SR-2 Completion before Concept Scope Model Representation 2020 Minor Arterial Street Added Travel Lanes Add 1 travel lane in each direction ID 239 Agency Road From To Valparaiso Division Road SR-2 US-30 Completion before Concept Scope Model Representation 2020 Minor Arterial Street Added Travel Lanes Add 1 travel lane in each direction The NIRPC transportation modeling process does not include a land use model. The socioeconomic data for the traffic analysis zones reflect the 2040 Growth and Revitalization Vision for northwestern Indiana. 6 Northwestern Indiana Regional Planning Commission _______ ____Air Quality Conformity Determination Relationship of Transportation Plan and TIP Conformity with the National Environmental Policy Act (NEPA) Process The degree of specificity required in the transportation plan and the specific travel network assumed for air quality modeling do not preclude the consideration of alternatives in the NEPA process, including environmental assessment and preparation of environmental impact statements, or other project development studies. Should the NEPA process result in a project with design concept and scope significantly different from that in the transportation plan or transportation improvement program, the project must meet the tests for total annual system emissions equal to or below the level of the 2002 emissions or the applicable budgets for the analysis years, and provide for TCM priority, if applicable, before NEPA process completion. During the congestion management system and other analyses for the capacity expansion projects in the 2040 Regional Transportation Plan, options other than the assumed design concept and design scope must be considered. Fiscal Constraints for the Transportation Plan and TIP The 2040 Regional Transportation Plan and Fiscal Year 2012 to 2015 Transportation Improvement Program are fiscally constrained consistent with DOT's metropolitan planning regulations in 23 CFR part 450. With the long term lease of the Indiana Toll Road, the Indiana Department of Transportation has achieved a funding mechanism, called Major Moves, to implement the projects in the statewide long range transportation plan. Criteria and Procedures for the Conformity Determination The Indiana State Implementation Plan for Air Quality establishes the criteria and procedures for the Conformity Determination. The Indiana SIP includes a duplicate of the original Federal transportation conformity rule. On August 15, 1997, after the establishment of the Indiana conformity rule as part of the SIP, the Federal conformity rule was amended to provide flexibility and streamlining. On June 1, 1998, the Indiana Department of Environmental Management issued a nonrule policy document that provides guidelines for conformity determination in light of Federal amendments. The nonrule policy document established the intent of IDEM to revise the SIP to mirror the new Federal amendments and to exercise its enforcement discretion to allow the features of the Federal amendments to be used. The conformity determination for the 2040 Regional Transportation Plan and Fiscal Year 2012 to 2015 Transportation Improvement Program meets the requirements of sections 93.110 (latest planning assumptions), 93.111 (latest emissions model), and 93.112 (consultation) of the Federal conformity rule, for conformity determinations during all periods, and sections 93.113 (b and c) (transportation control measures), 93.118 (adherence to motor vehicle emissions budgets), and 93.119 (interim emissions reductions) of the conformity rule, for the transportation improvement program conformity determination with respect to Summer day VOC and NOX emissions and the annual direct PM2.5 and NOX emissions. Latest Planning Assumptions The conformity determination is based on the latest planning assumptions. The transportation model uses the assumptions derived from estimates of current and future population, households, employment, travel and congestion most recently developed by NIRPC and approved by NIRPC. The estimates include 2010 population estimates from the 2010 Census, and employment estimates from the Indiana Department of Workforce 7 Northwestern Indiana Regional Planning Commission _______ ____Air Quality Conformity Determination Development ES-202 file. Trip generation rates, trip length, mode choice and other model parameters are based on a 1995 Household Travel Survey in Northwestern Indiana and compared to nationwide data. The 2007-2008 Household Travel Survey has not been incorporated into the trip generation rates for the transportation network model due to the lack of funding for the proposed model overhaul. The travel demand model was validated with respect to the year 2008 Highway Performance Monitoring System. The 2016, 2020, 2030 and 2040 population, household and employment forecasts were prepared in March, 2011 by NIRPC, using the latest available information. Since the previous conformity determination, the transit operating policies (including fares and service levels) have changed. The Regional Bus Authority began implementing several new fixed-route transit services, that replace and augment services previously provided by the Hammond Transit System. The new services have been incorporated into the model. Three routes provided by the Gary Public Transportation Corporation have been discontinued. These services have been eliminated from the model. Changes are assumed in existing transit fares within northwest Indiana over time. The model represents tolls on the Indiana Toll Road by links that correspond to tollbooths with a fixed travel time, based on the toll amount. The toll increases have been reflected in the transportation networks. Planning Assumptions 1. Population forecasts have been prepared by NIRPC. For the first time, NIRPC has been allowed to use forecasts that are not constrained by the county control totals, which have tended to underestimate growth in the region. The population numbers show a large increase in Porter County, and a slight increase in LaPorte County and Lake County. The population, households and employment data are allocated to the traffic analysis zones and are used in the regional emissions analysis. The totals for the three-county area are included in Table 2. Table 2. Socioeconomic Totals Population Households Employment 2000 741,468 277,324 303,850 2010 755,677 287,854 314,733 2016 776,834 291,921 281,122 2020 801,957 301,589 292,380 2030 861,956 325,047 320,155 2040 938,683 426,678 353,315 2. The Highway Performance Monitoring System (HPMS) data provided the basis for an analysis of the growth in Vehicle-Miles of Travel. Based on this data, the actual annual rate of growth of travel can be determined. For the three-county area, the rates range from -.88% per year to 2.84% per year between 1993 and 2008. Over this period, the annual rate of growth is 0.98% per year. 8 Northwestern Indiana Regional Planning Commission _______ ____Air Quality Conformity Determination Table 3. Vehicle-Miles of Travel data from the Highway Performance Monitoring System (HPMS) VMT Estimate Year (HPMS) 1993 18,829,591 1994 18,663,552 1995 19,847,112 1996 19,842,716 1997 21,058,741 1998 21,638,065 1999 21,249,847 2000 21,527,000 2001 21,987,000 2002 22,147,635 2003 22,201,000 2004 22,154,000 2005 22,216,000 2006 22,305,000 2007 22,397,000 2008 21,792,000 Annual Rate of Growth Since 1993 -0.88% 2.67% 1.76% 2.84% 2.82% 2.04% 1.93% 1.96% 1.82% 1.66% 1.49% 1.39% 1.31% 1.25% 0.98% 3. Adjustment factors have been produced to relate the vehicle-miles of travel produced by the transportation network model to the Highway Performance Monitoring System estimates for 2008. Overall the model’s estimate of VMT is approximately 4% higher than the HPMS. These adjustment factors have been applied to model-generated estimates on a link by link basis. Table 4. Model Calibration (Year 2008) Lake County HPMS vmt Model vmt M/H 11 Urban Interstate 3,566,000 3,570,560 1.00 12 Urban Other Expressway 564,000 563,015 1.00 14 Urban Principal Arterial 2,870,000 2,867,692 1.00 16 Urban Minor Arterial 1,955,000 1,964,341 1.00 17 Urban Collector 785,000 772,360 0.98 18 Urban Local 2,182,000 2,174,895 1.00 1 Rural Interstate 481,000 484,476 1.01 2 Rural Principal Arterial 135,000 136,512 1.01 6 Rural Minor Arterial 85,000 85,010 1.00 7 Rural Major Collector 314,000 316,261 1.01 8 Rural Minor Collector & Local 80,000 193,965 2.42 Porter County 11 Urban Interstate 1,118,000 1,114,514 1.00 14 Urban Principal Arterial 1,232,000 1,233,414 1.00 16 Urban Minor Arterial 436,000 440,380 1.01 17 Urban Collector 205,000 205,021 1.00 18 Urban Local 550,000 550,399 1.00 9 Northwestern Indiana Regional Planning Commission _______ ____Air Quality Conformity Determination Table 4 Continued 1 Rural Interstate 144,000 446,582 3.10 2 Rural Principal Arterial 180,000 192,123 1.07 6 Rural Minor Arterial 143,000 145,355 1.02 7 Rural Major Collector 644,000 681,285 1.06 8 Rural Minor Collector & Local 167,000 305,186 1.83 LaPorte County 11 Urban Interstate 271,000 451,462 1.67 14 Urban Principal Arterial 577,000 590,997 1.02 16 Urban Minor Arterial 317,000 317,676 1.00 17 Urban Collector 105,000 106,180 1.01 18 Urban Local 300,000 296,267 0.99 1 Rural Interstate 884,000 815,149 0.92 2 Rural Principal Arterial 327,000 324,222 0.99 6 Rural Minor Arterial 428,000 424,438 0.99 7 Rural Major Collector 504,000 507,378 1.01 8 Rural Minor Collector & Local 243,000 431,718 1.78 TOTAL 21,792,000 22,708,830 1.04 4. Vehicle registration data have been received from the Indiana Bureau of Motor Vehicles. These data are split by vehicle type, and have an associated date of approximately January 1, 2004. The Indiana Department of Environmental Management provided vehicle age information for cars and light trucks, from the application of a vehicle identification number (VIN) decoder. This vehicle registration data have been used in the Mobile 6.2 input file, reflecting vehicle fleet age by vehicle type for smaller vehicles. For larger vehicle types, default data have been determined to be the best available fleet age information. An updated set of vehicle registration data is being prepared by the Indiana Department of Transportation. The draft data have been found to be problematic for the conformity process, because the vehicle fleet is seen as older and less efficient than the fleet reflected in the current data. Updated motor vehicle emissions budgets are necessary prior to the next conformity determination once the new data are officially released. 5. There have been recent changes to transit fares in northwest Indiana. The Gary Public Transportation Corporation, Regional Bus Authority and Northern Indiana Commuter Transportation District have increased fares in 2010 and 2011. Exempt Projects The reconstruction and two-way left turn lane projects are now treated as nonexempt, with the network modified to represent such continuous two way left turn lane projects with a 10% increase in the per hour per lane capacity. Other exempt projects are listed in the Transportation Improvement Program. Project Changes Some of the local projects that were originally proposed have not made sufficient progress to achieve the originally planned 2010 network, and have been delayed and/or removed from the plan. Some of these projects are included in later year networks in the transportation network model used for the regional emissions analysis. The Cline Avenue Bridge (SR-912) over the Indiana Harbor Canal was closed to traffic in November, 2009 after serious structural deficiencies were found. The 10 Northwestern Indiana Regional Planning Commission _______ ____Air Quality Conformity Determination preferred alternative is the detour route on Dickey Road and Riley Road. These two collector roads would provide a short link on an expressway corridor. While the NEPA process is underway, INDOT is considering various options for the routing of this highway. Horizon Year The horizon year is 2040. The 2040 Comprehensive Regional Plan provides a policy-oriented distribution of population and households. This distribution is reflected in the project selection system for the plan, giving significant weight to projects in the revitalization areas in Gary, Hammond, East Chicago and Michigan City, as well as livable centers that provide for mixed land uses and greater transportation options. The methods and assumptions for the transportation network model in the regional emissions analysis are included in The Transportation Model Documentation Report. KPMG, the consultants for the major investment study of the INDOT facilities in northwestern Indiana, concluded that the NIRPC model is in agreement with acceptable professional practice. The 2009 certification review concluded that the model meets or exceeds the standards of travel demand models in use at small and medium sized Metropolitan Planning Organizations (MPOs). Latest Emissions Model On January 23, 2002 the USEPA officially released the Mobile6 Emission Factor model. The emission factor model has been used in the regional emissions analyses for this transportation conformity determination. Discussions with the IDEM staff on the parameters and inputs for Mobile6 have been extensive. The Mobile 6.2 descriptive output file provided emissions rates for composite types of vehicles. These rates were imported into a Microsoft Excel spreadsheet and applied to the output from the Emme transportation network model. In a Microsoft Access database, the output from the Emme transportation network model for three vehicle types (Personal Vehicles, Non-Heavy Commercial Trucks, and Heavy Duty Vehicles) were split to twenty-eight vehicle types using factors based on a factoring process provided by IDEM and analyzed by NIRPC. The 12-class assignment was also used to identify VMT from vehicles from external trip ends, so that their start and evaporative emissions could be excluded from the analysis as appropriate. The emissions from transit vehicles used the emissions rates for transit buses, as well. The Mobile 6.2 input files are included in Appendix G. On March 2, 2010 the USEPA officially released the MOVES model, with a two year grace period. The MOVES model must be used instead of Mobile 6.2 beginning on March 2, 2012. As with the vehicle registration data, the motor vehicle emissions budgets will need to be revised prior to the conformity process in 2012 due to the increases in the emissions estimates generated by the new model. TCM Implementation The 2040 Regional Transportation Plan and Fiscal Year 2012 to 2015 Transportation Improvement Program are not required to provide for timely implementation of TCMs from the SIP, since the SIP currently contains no TCMs. Consistency with the Motor Vehicle Emission Budgets in the SIP The regional emissions analysis has estimated emissions of VOC and NOX as ozone precursors. The regional emissions analysis includes estimates of emissions from the entire transportation system, including all regionally significant projects contained in the transportation plan and all other regionally significant highway and transit projects expected in the nonattainment area in the time frame of the transportation plan. The emissions analysis methodology meets the requirements of Section 93.122(b) of the Federal Conformity Rule, for conformity determinations based on estimates of regional transportation-related emissions completed after January 1, 1997. 11 Northwestern Indiana Regional Planning Commission _______ ____Air Quality Conformity Determination Implementation of the Lake and Porter County projects and the La Porte County projects in the regional transportation plan results in motor vehicle emissions that are below the levels of the applicable Motor Vehicle Emissions Budgets, as shown in Table 5. This table also indicates that the implementation of the Lake and Porter County projects in the regional transportation plan result in motor vehicle emissions that are below the level of the proposed Motor Vehicle Emissions Budgets in the proposed Maintenance Plans for the PM2.5 nonattainment area, which is under review for redesignation as a maintenance area. Emission Reductions in Areas Without Motor Vehicle Emissions Budgets The 2040 Regional Transportation Plan and Fiscal Year 2012 to 2015 Transportation Improvement Program contribute to emissions reductions. Annual Direct PM2.5 emissions and annual NOX PM2.5 precursor emissions in the action scenario for each analysis year are less than or equal to the 2002 emissions estimates for the PM2.5 nonattainment area, as indicated in Table 5. Procedures for Determining Regional Transportation-related Emissions The regional emissions analysis for the transportation plan includes calculations of vehicle emissions at the aggregate level for the entire transportation system, including all regionally significant expansion projects expected in the nonattainment area. The analysis includes FHWA/FTA-funded projects proposed in the transportation plan, all Indiana Toll Road projects and all other regionally significant projects which are disclosed to NIRPC. Vehicle miles traveled (VMT) from projects which are not regionally significant are estimated in accordance with reasonable professional practice, using the regional travel demand model and the procedure for projects that are regionally significant. The regional emissions analysis does not include any TCMs for emissions reduction credit. The regional emissions analysis does not include emissions reduction credit from projects, programs, activities, or control measures which require a regulatory action in order to be implemented. Ambient temperatures used for the regional emissions analysis are consistent with those used to estimate the emissions in 2002. All other factors, for example the fraction of travel in a hot stabilized engine mode, are consistently applied. Reasonable methods have been used to estimate nonattainment area VMT on off-network roadways within the urban transportation planning area, and on roadways outside the urban transportation planning area. For 2016, 2020, 2030 and 2040, estimates of regional transportation-related emissions used to support the conformity determination have been made using a network-based travel model with travel calculations performed at the individual link level according to procedures and methods that are available and in practice and supported by current and available documentation (see The Transportation Model Documentation Report). Intrazonal VMT has been added to the link VMT on associated centroid connectors for the analysis. The travel characteristics were calculated separately for three vehicle classes: autos (light duty gasoline vehicles), non-heavy trucks (light duty gasoline trucks 1) and heavy trucks (heavy duty diesel vehicles) and separately for three time periods: morning peak, afternoon peak and off peak. Using factors provided from the Indiana Department of Environmental Management, the travel characteristics were split to represent 28 vehicle types, and the emissions were calculated using a Microsoft Excel spreadsheet. The participating agencies have discussed these modeling procedures and practices through the interagency consultation process. The Network-based travel model has been validated against observed counts for a 2008 base year, which is not more than 10 years prior to the date of the conformity determination. Model forecasts have been analyzed for reasonableness and compared to historical trends and other factors, and the results have been documented (see The Transportation Model Documentation Report). Land use, population, employment, and other network-based travel model assumptions have been documented based on the best available information. The scenario of land development and use is consistent with the future transportation system alternative for which emissions have been estimated. The distribution of employment and residences for the preferred transportation alternative are reasonable. A capacity-sensitive assignment methodology has been used, and emissions estimates are based on a methodology, which differentiates between peak and off-peak link volumes and speeds, and uses speeds based on final assigned volumes, post- processed in the database. Zone-to-zone travel impedances used to distribute trips between origin and destination pairs are in 12 Northwestern Indiana Regional Planning Commission _______ ____Air Quality Conformity Determination reasonable agreement with the travel times that are estimated from final assigned traffic volumes, using a feed-back procedure iterated five times. These times have also been used for modeling mode splits. The network-based travel model is reasonably sensitive to changes in the time(s), cost(s), and other factors affecting travel choices. Reasonable methods in accordance with good practice have been used to estimate traffic speeds and delays in a manner that is sensitive to the estimated volume of travel on each roadway segment represented in the network-based travel model. Highway Performance Monitoring System (HPMS) estimates of vehicle miles traveled (VMT) are considered the primary measure of VMT within the portion of the nonattainment area and for the functional classes of roadways included in the nonattainment area. The model provides estimates of Vehicle-Miles of Travel that are approximately 4% higher than the HPMS. (See The Transportation Model Documentation Report.) Table 5. Regional Emissions Analysis Results (SR-912 No-Bridge Option) Year 2002 2016 2020 2030 2040 Ozone Emissions in US Tons per Day Lake and Porter Counties VOC Budgets VOC Emissions NOx Budgets NOx Emissions 10.50 6.00 6.00 6.00 4.71 4.03 3.95 4.51 40.60 12.60 12.60 12.60 10.26 6.92 4.79 5.07 LaPorte County VOC Budgets VOC Emissions NOx Budgets NOx Emissions 5.25 3.40 3.40 3.40 1.77 1.53 1.44 1.56 18.85 6.50 6.50 6.50 3.68 2.66 1.88 1.93 PM2.5 Emissions in US Tons per Year Lake and Porter Counties Draft Budgets 562.64 111.69 104.38 109.20 122.12 145.37 145.37 132.70 132.70 Direct PM Emissions Draft Budgets 5,697.86 5,697.86 2,915.19 2,915.19 NOx Precursor Emissions 30,397.97 3,906.95 2,721.93 1,955.43 2,102.45 Northeastern Illinois Direct PM Emissions NOx Precursor Emissions 3,070.78 1,073.93 969.53 957.10 1003.50 167,630.81 40,800.91 27,727.06 19,099.32 19,304.80 Nonattainment Area Total Direct PM Emissions NOx Precursor Emissions 3,633.42 1,185.62 1,073.91 1,066.30 1,125.62 198,028.78 44,707.86 30,488.99 21,054.75 21,407.25 13 Northwestern Indiana Regional Planning Commission _______ ____Air Quality Conformity Determination Table 5 Continued (SR-912 With-Bridge Option) Year Ozone Emissions in US Tons per Day Lake and Porter Counties 2002 2016 2020 2030 2040 VOC Budgets VOC Emissions NOx Budgets NOx Emissions 10.50 6.00 6.00 6.00 4.71 4.05 3.97 4.50 40.60 12.60 12.60 12.60 10.34 6.96 4.81 5.09 LaPorte County VOC Budgets VOC Emissions NOx Budgets NOx Emissions 5.25 3.40 3.40 3.40 1.78 1.53 1.44 1.56 18.85 6.50 6.50 6.50 3.68 2.66 1.88 1.93 PM2.5 Emissions in US Tons per Year Lake and Porter Counties Draft Budgets 145.37 145.37 132.70 132.70 Direct PM Emissions 562.64 112.30 104.74 109.60 122.55 Draft Budgets 5,697.86 5,697.86 2,915.19 2,915.19 NOx Precursor Emissions 30,397.97 3,931.12 2,733.80 1,964.01 2,111.42 Northeastern Illinois Direct PM Emissions NOx Precursor Emissions 3,070.78 1,073.93 969.53 957.10 1,003.50 167,630.81 40,800.91 27,727.06 19,099.32 19,304.80 Nonattainment Area Total Direct PM Emissions NOx Precursor Emissions 3,633.42 1,186.23 1,074.27 1,066.70 1,126.05 198,028.78 44,732.03 30,460.86 21,063.33 21,416.22 Conclusion 14 Northwestern Indiana Regional Planning Commission _______ ____Air Quality Conformity Determination The Summer day on-road mobile source emissions of the precursors of ozone (VOC and NOX) in Lake and Porter Counties that result from the implementation of the projects in the 2040 Regional Transportation Plan and the Fiscal Year 2012 to 2015 Transportation Improvement Program, as defined by the action scenarios for 2016, 2020, 2030 and 2040 are less than the Motor Vehicle Emission Budgets established in the Maintenance Plan included in the U.S. EPA approved State Implementation Plan for Lake and Porter Counties. The Summer day on- road mobile source emissions of the precursors of ozone (VOC and NOX) in La Porte County that result from the implementation of the projects in the 2040 Regional Transportation Plan and the Fiscal Year 2012 to 2015 Transportation Improvement Program, as defined by the action scenarios for 2016, 2020, 2030 and 2040 are less than the Motor Vehicle Emission Budgets in the Maintenance Plan included in the U.S. EPA approved State Implementation Plan for La Porte County. The on-road mobile source emissions of annual direct PM2.5 and annual nitrogen oxide in the bi-state PM2.5 nonattainment area that result from the implementation of the projects in the 2040 Regional Transportation Plan and the Fiscal Year 2012 to 2015 Transportation Improvement Program as defined by the action scenarios for 2016, 2020, 2030 and 2040 are no greater than the 2002 emissions. Therefore, the 2040 Regional Transportation Plan and the Fiscal Year 2012 to 2015 Transportation Improvement Program have been found to conform to the requirements of section 176(c) of the Clean Air Act Amendment and the related requirements of the Final Transportation Conformity Rule (40 CFR Part 51 and 40 CFR Part 93) with respect to ozone and PM2.5. 15